The above pixs are taken at Gng Irau, Cameron on Sept 20th when i lead a group of 25 climbers
The trail currently been closed due to construction of a walkway 500 meters in, however we sneak thru' by the backway.
The walkway will be ready after Hari Raya.
No comments:
Post a Comment